6 Essential Garment Engineering Formulas

Table of Contents
Description:
Learn 6 essential garment engineering formulas to improve line efficiency, reduce costs, and increase productivity in garment factories with clear examples.6 Essential Formulas For Garment Engineering.
Note: For formulas( 1-6) click on below post’s link.
https://subhowto.com/wp-admin/post.php
Formula #7: Line WIP (Work in Process)
Line WIP (work in process) = Total pieces lying on the line for a particular order line
WIP of the line of an order is equal to the Total pieces loaded till date minus the Total pieces out till date.
Explanation:
WIP represents the number of unfinished garments currently on the production line for a particular order. It helps track how much work is still pending and ensures smooth workflow.
Example:
If 1,000 pieces were loaded into the line and 700 pieces are finished and moved out,WIP=1000โ700=300โpieces.
Formula #8: Standard Time
Standard Time = (Observed time X observed rating) + Allowances
Allowances โ Relaxation allowance, contingency allowance
Explanation:
Standard time is the time allowed for completing a task, including allowances.
- Relaxation allowance: For rest and recovery.
- Contingency allowance: For delays or minor interruptions.
Example:
If the observed time is 10 minutes, the observed rating is 1.1 (110%), and allowances are 2 minutes,Standard Time=(10ร1.1)+2=13โminutes.https://subhowto.com/wp-admin/post.php
Formula #9: Machine Utilization (%)
Machine utilization% = (Actual Machine running Time X 100) / Time available
Explanation:
This formula measures the percentage of time a machine is actively running compared to its total available time.shakeel.ahmedblogspot.com
Example:
If a machine runs for 6 hours out of an 8-hour shift,
Machine Utilization=6ร1008=75%.text{Machine Utilization} = frac{6 times 100}{8} = 75%.Machine Utilization=86ร100โ=75%.
Formula #10: Cost per Minute
Cost per minute = Total cost incurred in labor / Total available working minute in a day X no. of laborers
Explanation:
This formula gives the cost of one minute of labor on the production floor, which helps in pricing and budgeting.
Example:
If the total labor cost is $500, there are 10 laborers working 480 minutes (8 hours) each,Cost per Minute=500480ร10=0.10โUSD/min.
Formula #11: Production Cost per Unit
Production Cost per unit = Total cost incurred in a day/ no. of garments produced in a day
Explanation:
This formula helps calculate the average cost of producing a single garment, which is essential for pricing and profit calculations.
Example:
If the total production cost for the day is $1,000 and the factory produces 500 garments,Production Cost per Unit=1000/500=2โUSD per garment.
Formula #12: Man-to-Machine Ratio
Man to Machine ratio = Total manpower of the factory / Total no. of sewing machines (utilized)
Explanation:
This ratio indicates the average number of workers available for each sewing machine. It is a critical metric for manpower planning and resource allocation.
Example:
If there are 200 workers and 100 sewing machines in a factory,Man-to-Machine Ratio=200100=2.This means 2 workers are available for each sewing machine.
Why These Formulas Are Important
These 6 essential garment engineering formulas are immported for:
- Monitoring efficiency: Measuring productivity, machine performance, and line balance.
- Cost control: Calculating labor and production costs accurately.
- Resource optimization: Determining manpower and machine requirements.
- Better planning: Ensuring smooth workflow and meeting delivery deadlines.
FAQs โ 6 Essential Formulas for Garment Engineers
1. Why is Line WIP important in garment production?
Line WIP helps track unfinished garments on the line and prevents bottlenecks or delays in the production flow.
2. What is the difference between Observed Time and Standard Time?
Observed Time is the actual time recorded for a task, while Standard Time includes allowances for rest and interruptions.
3. How can I reduce the Production Cost per Unit?
By improving line efficiency, reducing material wastage, and optimizing labor cost.
4. What is a good Man-to-Machine Ratio?
It depends on the factory setup, but a ratio of 1.5 to 2 workers per machine is common in many garment factories.
5. How does Machine Utilization impact productivity?
Higher machine utilization means machines are running efficiently, leading to better output and reduced downtime.


Leave a Reply